Timely Prefinished Steel Door Frames Installation Instructions

Timely Prefinished Steel Door Frames

Timely Prefinished Steel Door Frames

Http Www Timelyframes Com Wp Content Uploads Pdfs Timelytrainingmanualjan2014 Pdf

Http Www Timelyframes Com Wp Content Uploads Pdfs Timelytrainingmanualjan2014 Pdf

Timely Frames Prefinished Steel Door Frames Products Page Timely Industries

Timely Frames Prefinished Steel Door Frames Products Page Timely Industries

Timely Steel Door Frames 47s 345

Timely Steel Door Frames 47s 345

Double Egress De Series Egress Door Frame Frame

Double Egress De Series Egress Door Frame Frame

Classic Pair With Sidelight S Aluminium Doors Door Frame Classic Frame

Classic Pair With Sidelight S Aluminium Doors Door Frame Classic Frame

Classic Pair With Sidelight S Aluminium Doors Door Frame Classic Frame

Like hollow metal drywall frames timely frames are installed in walls constructed with either wood stud or steel stud framing but are installed after the the drywall is applied and painted.

Timely prefinished steel door frames installation instructions.

Timely industries is the leading manufacturer of prefinished steel door frames outperforming other door frames with lower opening costs. Frame meets u b c 7 2 97 ul 10 c ul 1784 smoke rating cbc 7 2 1998 part 1 2. 2 from any end. When installing the timely frame in a steel stud wall the frame must be 1 8 wider than the stud size because the stud actually rests in a track section that is 1 8 larger than the stud dimension.

Align the miter and snap the upright casing over one clip at the top. This creates instant wall growth. Sleeve the transom mullion over the brackets sleeve the transom mullion over the bracket on each jamb and insert the self drilling screw through the small hole in the transom mullion and into the pre drilled hole in the bracket. Timely prefinished steel door frames are an ideal solution for most interior commercial drywall applications.

Prefinished steel door frames. Create an equal gap between the door and frame at the strike location and fasten. 1 3 4 door 3 face header use with sub frame for cmu application 3 face no stop header use with standard frame for concealed overhead closer installation 3 face insert use for sub frame at head with standard frame in cmu glass stop or door panel can be applied to one or both sides of any mullion or jamb. This page is the overview of all frames.

3 piece kd knocked down frame. Minimum 6 drywall screws recommended. All frames that are fire rated require a fire label. Install a casing corner piece in the upright casing and insert it into the header casing.

Fasten the remainder of the strike jamb at every clip on the door side only. Length of screws must be sufficient to penetrate into steel stud by at least 1 2 and into wood stud at least 1. Available in both door sizes. We provide the 50 5 frame at the same price as a 47 4 7 8 to accommodate the larger wall size.

No painting time and money saved. Corporate office 818 492 3500 or. Create an equal gap between the door and frame at the bottom of the strike jamb and fasten. Timely industries products pages present complete specifications and details about our prefinished steel door frames.

Pull the header tight to the strike jamb and apply a fastener at the corner of the header. Apply casing to the trim kit using the same method as timely s standard frame. Beginning at the head center the header casing in the opening and snap it over one clip in the center.

Classic Pair With Transom Classic Frame Door Frame Classic

Classic Pair With Transom Classic Frame Door Frame Classic

Kd Knocked Down Hollow Metal Drywall Frame 16 Ga Steel Frame

Kd Knocked Down Hollow Metal Drywall Frame 16 Ga Steel Frame

Welded Commercial Hollow Metal Door Frames

Welded Commercial Hollow Metal Door Frames

Single Dutch Dutch Door Door Frame Frames On Wall

Single Dutch Dutch Door Door Frame Frames On Wall

Source : pinterest.com